300-425 Exam - Designing Cisco Enterprise Wireless Networks (ENWLSD)

certleader.com

Examcollection 300-425 Questions are updated and all 300-425 answers are verified by experts. Once you have completely prepared with our 300-425 exam prep kits you will be ready for the real 300-425 exam without a problem. We have Down to date Cisco 300-425 dumps study guide. PASSED 300-425 First attempt! Here What I Did.

Also have 300-425 free dumps questions for you:

NEW QUESTION 1
A customer is running a guest WLAN with a foreign/export-anchor setup. There is one anchor WLC in the US and two in Europe. Anchor WLC priorities are used to prefer local anchors. During a routine network audit, it is discovered that a large number of guest client sessions in the US are anchored to the WLCs in Europe. Which reason explains this behavior?

  • A. The foreign WLC failed and recovered.
  • B. The US anchor WLC failed and recovered.
  • C. The US anchor WLC is anchored to itself with a priority value of zero.
  • D. The anchor WLC is in the same mobility group.

Answer: B

NEW QUESTION 2
A wireless engineer is designing a wireless network for a warehouse using access points with internal antennas. Which two elements have a negative effect on the wireless users? (Choose two.)

  • A. wireless channels
  • B. access point height
  • C. client authentication
  • D. client authorization
  • E. absorption

Answer: BE

NEW QUESTION 3
Which statement about AP failover priority for access points when configured with priority 1 or 4 is true?

  • A. When configured with priority 1, the access point is assigned with the highest priority level and it is marked as critica
  • B. This access point fails over before other access points with the lower priority when there is primary controller failure.
  • C. When configured with priority 4, the access point is assigned with the highest priority level and it is marked as critica
  • D. This access point fails over before other access points with the lower priority when there is primary controller failure.
  • E. When configured with priority 4, the access point is assigned with the lowest priority level and it is marked as lo
  • F. This access point fails over after other access points with the higher priority when there is primary controller failure.
  • G. When configured with priority 1, the access point is assigned with the medium priority level and it is marked as mediu
  • H. This access point fails over after other access points with the higher priority when there is primary controller failure.

Answer: B

NEW QUESTION 4
A customer has determined that aesthetics is a primary concern for their upcoming guest deployment. Which design consideration can be leveraged to address this concern?

  • A. Paint the access point to cover the LED from being noticeable.
  • B. Use enclosures to hide the wireless infrastructure in the surrounding environment.
  • C. Use AIR-AP-BRACKET-1 to allow for greater mounting locations
  • D. Deploy environmentally friendly cabling components to blend into the environment.

Answer: D

NEW QUESTION 5
A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)

  • A. Use a battery pack to power APs
  • B. Use a drawing of the office space to draw AP and client placements.
  • C. Use DoS attack on APs while measuring the throughput.
  • D. Use APs with directional antennas.
  • E. Use APs with external antennas.
  • F. Use APs with built-in antennas.

Answer: ABF

NEW QUESTION 6
A wireless deployment in a high-density environment is being used by vendors to process credit card payment transactions via handheld mobile scanners. The scanners are having problems roaming between access points in the environment. Which feature on the wireless controller should have been incorporated in the design?

  • A. RX SOP
  • B. 802.11w
  • C. AP Heartbeat Timeout
  • D. Application Visibility Control

Answer: A

NEW QUESTION 7
A company wants to replace its existing PBX system with a new VoIP System that will include wireless IP phones. The CIO has concerns about whether the company’s existing wireless network can support the new system. Which tool in Cisco Prime can help ensure that the current network will support the new phone system?

  • A. Location Readiness
  • B. Site Calibration
  • C. Map Editor
  • D. Voice Readiness

Answer: D

NEW QUESTION 8
A network engineer is configuring high availability on an access point. What is the maximum number of controllers that can be configured?

  • A. 1
  • B. 2
  • C. 3
  • D. 4

Answer: B

NEW QUESTION 9
An engineer must decide the cell overlap for a wireless voice deployment. Which Cisco measurement recommendation should be considered?

  • A. The edge of the cell should be -67 dBm.
  • B. The edge of the cell should be below 35 RSSI.
  • C. The measurement should be done on the 2.4-GHz band.
  • D. One AP should be deployed per 3000 square feet.

Answer: A

NEW QUESTION 10
A university is in the process of designing a wireless network in an auditorium that seats 500 students and supports student laptops. Which design methodology should the university implement in the auditorium?

  • A. roaming design model
  • B. voice design model
  • C. location design model
  • D. high-density design model

Answer: B

NEW QUESTION 11
Multiple WLCs are implemented in a high-availability configuration in a mobility group. APs are deployed with only a primary controller assigned. By default, which mobility group member controller do the orphaned APs join in the event of a failed controller?

  • A. controller with the most available AP free license capacity
  • B. controller with the lowest percent of associated APs per license capacity
  • C. controller with the least CPU utilization over the last reporting period
  • D. controller with the least number of associated APs

Answer: D

NEW QUESTION 12
An engineer is designing a wireless deployment for a university auditorium. Which two features can be used to help deal with the issues introduced by high AP count? (Choose two.)

  • A. TSPEC
  • B. RXSOP
  • C. TPC
  • D. LSS
  • E. DFS

Answer: CE

NEW QUESTION 13
A wireless engineer is performing a post verification of a wireless network. Which two metrics does the engineer verify to ensure that the wireless network can support voice services? (Choose two.)

  • A. The coverage area must have a noise floor that does not exceed -87 dBm.
  • B. The client device must have at least an -67 dBm RSSI.
  • C. The rate of retransmitted packets must be 15 percent or below.
  • D. The rate of retransmitted packets must be 20 percent or below.
  • E. The client device must have at least an -65 dBm RSSI.

Answer: BC

NEW QUESTION 14
Clustering Cisco WLCs into a single RF group enables the RRM algorithms to scale beyond the capabilities of a single Cisco WLC. How many WLC and APs in an RF group can the controller software scale up to in WLC release 8.9 depending on the platform?

  • A. up to 20 WLCs and 1000 APs
  • B. up to 20 WLCs and 3000 APs
  • C. up to 20 WLCs and 4000 APs
  • D. up to 20 WLCs and 6000 APs

Answer: D

NEW QUESTION 15
A wireless engineer is designing a wireless network to support real-time applications over wireless. Which IEEE protocol mus the engineer enable on the WLC so that the number of packets that are exchanged between an access point and client are reduced and fast roaming occurs?

  • A. 802.11w
  • B. 802.11r
  • C. 802.11i
  • D. 802.11k

Answer: D

NEW QUESTION 16
......

Recommend!! Get the Full 300-425 dumps in VCE and PDF From Surepassexam, Welcome to Download: https://www.surepassexam.com/300-425-exam-dumps.html (New 100 Q&As Version)