3v0-624 Exam - VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam

certleader.com

Want to know Examcollection 3v0-624 Exam practice test features? Want to lear more about VMware VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam certification experience? Study Best Quality VMware 3v0-624 answers to Up to the minute 3v0-624 questions at Examcollection. Gat a success with an absolute guarantee to pass VMware 3v0-624 (VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam) test on your first attempt.

NEW QUESTION 1
A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.
In this scenario, when two source types are supported? (Choose two.)

  • A. powered-off Windows Server 2008 physical machine
  • B. powered-on Windows Server 2000 Workstation virtual machine
  • C. powered-off Windows Server 2008 Workstation virtual machine
  • D. powered-on Windows Server 2008 physical machine

Answer: CD

NEW QUESTION 2
A database administrator is operating a virtual machine (VM) configured with 16 vCPU and 64GB of RAM. A recent performance audit has indicated that this virtual machine is oversized and is using less than 60% of its configured CPU and memory capacity.
• The ESXi host that contains this VM has 2 physical processors with 10 cores per processor, and 128GB of
RAM.
• This physical host's architecture is split into two equal NUMA nodes.
Which vCPU and RAM configuration for the VM allows for the most resources, but also provides the performance benefit of local NUMA access?

  • A. 16 vCPU and 32GB RAM
  • B. 4 vCPU and 16GB RAM
  • C. 10 vCPU and 64GB RAM
  • D. 12 vCPU and 64GB RAM

Answer: C

NEW QUESTION 3
A company would like to leverage snapshot technology on vSphere 6.5. Which configuration supports taking snapshots?

  • A. Windows Failover Cluster VM with RDM in virtual mode
  • B. vSphere Fault Tolerance VM
  • C. Windows Failover Cluster VM with RDM in physical mode
  • D. SQL Always On Availability Group

Answer: A

NEW QUESTION 4
Match the business statement to its appropriate concept.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 5
When considering server consolidation, plan on running vCPUs per core.

  • A. 1 to 2
  • B. 3 to 4
  • C. 4 to 6
  • D. 6 to 8

Answer: A

NEW QUESTION 6
A customer has requested a high availability option for its data center in the event of power failure and the loss of connectivity to a virtual machine.
Which three vSphere features support fault tolerance? (Choose three.)

  • A. HA
  • B. Virtual volume datastore
  • C. vMotion
  • D. Storage-based policy management
  • E. DRS
  • F. Virtual machine snapshots

Answer: ACE

NEW QUESTION 7
An organization's security policy requires a design where the ESXi hosts will be manageable only through vCenter Server.
Which two security configurations will help meet this requirement? (Choose two)

  • A. enable lockdown mode strict
  • B. disable DCUI access
  • C. enable lockdown mode normal
  • D. disable shell access

Answer: AD

NEW QUESTION 8
A customer has requested a vSphere 6.5 deployment design that utilizes vCenter Server and the use of vMware-recommended best practices for securing vCenter Server.
Which three actions would satisfy these requirements? (Choose three.)

  • A. Utlizing vSphere CLI and vSphere SDK for Perl scripts.
  • B. Restricting vCerter Server access to only the management network
  • C. Assigning the default Administrator role to all administrator users.
  • D. Synchronizing time in vCenter Server with a NIP source.
  • E. Removing expired and revoked certificates from vCenter Server system.

Answer: BDE

NEW QUESTION 9
You have been tasked with creating a vSphere 6.5 data center design for an organization. After interviewing key stakeholders and subject matter experts for a new implementation, it was determined that:
1. Existing network infrastructure should be sufficient.
2. HIPPA compliance must be maintained.
3. Mission critical applications must be recoverable.
4. Provide training to staff to ensure they can support the implementation.
5. IT department capital investment has been agreed upon and approval is nearly complete.
For each statement, you must determine if the statement should be categorized as an assumption, constraint, requirement or risk.
Match each Business Statement by dragging the red Statement buttons (S1-S5) over the text of the appropriate Categorization.
NOTE: Statements can have more than one Categorization.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 10
Customer Information
The Customer Labtown has a new vSphere 5 environment with one of their line of business applications recently being virtulized. Labtown requires that their Webserver, Database Server, and Fileserver for their line of business app be created into a vAPP. The VM's should start up in a specific order to insure the application starts correctly after an outage or reboot. Labtown also wants the best performance possible out of each VM. There is three hosts in the cluster each running the same CPU and Memory specifications. each host is running at 60% utilization right now. Labtown doesn't have any budget for more hosts.
Create a logical vAPP design for Labtowns Line of Business Application Requirements
- The server must boot in the following order: DB, Fileserver, WebServer
- Each VM must perform the best it can with the current cluster configuration Instructions
- Place the three VM's on the vAPP
- Place the boot order boxes ontop of each VM to indicate the VM's boot order
- Place the VM stencil for each VM in the DRS rules section if you wish to apply DRS rules to the design
- As long as VM's are on the vAPP stencil marks will be scored
See the solution below

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Check below for answer solution
3V0-624 dumps exhibit

NEW QUESTION 11
Customer Requirements:
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has produced two 24 port FC switches, and Asymmetrical Active/Active storage array (2 storage Processors with 4 ports each) and 22 ESXi Hosts with 2 dual port HBAs in each. Due to budgetary constraints, the organization cannot purchase anymore equipment. They have provided the following requirements:
- The existing Fibre Channel (FC) Asymmetrical Active/Active Array and FC switches must be used.
- No single point of failure to any datastore.
- Configuration must provide failover and load balancing.
- The customer requires a solution that will accommodate virtual machines with three different I/O load requirements:
- Static web virtual machines
- Critical application virtual machines.
- Object storage for their database virtual machines. Design Requirements:
Create a logical design that be applied to each of the ESXi Hosts. The design should meet, but not exceed the customer’s requirements and should include:
- All required hardware
- All required resources
Place the required datastore(s) in the storage array(s). Connect the storage processor(s) to the storage array(s). Connect the switch(es) to the storage processor(s) and HBA(s). Connect the ESXi host to the HBA(s) and Path Selection Policies.
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Check below for answer solution
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

NEW QUESTION 12
A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution.
Which three storage policies should be used? (Choose three.)

  • A. RAID5/6 for data disk and RAID1 for OS disk with FTT=2.
  • B. IOPS limit and checksum should be enabled.
  • C. RAID5/6 for OS disk and RAID1 for data disk with FTT=2.
  • D. Configure multiple disk stripes.
  • E. Deduplication and Compression should be disabled.

Answer: CDE

NEW QUESTION 13
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided information via requirements gathering. Evaluate each statement and determine if the requirement is functional or non-functional.
Match Requirements on the left by dragging the red buttons (R1-R9) over the text of the appropriate Classification.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 14
An organization is trying to determine whether it should use the Windows version of the vCenterServer or use the vCenter Server Appliance (VCSA). The organization will be using an externalOracle database, and it will manage about 30 ESXi hosts and about 200 virtual machines on 1
vCenter Server, but it would also like to see another group's vCenter Server from the samevSphere client window. Which type of vCenter Server should it use, and why?

  • A. The vCenter Server Appliance (VCSA) because it can be used with Oracle
  • B. The VCSA because it can support 30 ESXi hosts
  • C. The Windows version because it can support Oracle
  • D. The Windows version because it can support Linked mode

Answer: A

NEW QUESTION 15
You have been provided with a list of requirements for a vSphere Design. For each requirement, categorize the requirement as a component of the WRT, RTO, RPO, MTD, and Recoverbility.
Drag a requirement button (R1-R8) over to the green space provided beside the corrisponding Design Phase.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 16
You have been tasked with creating a vSphere 6.5 data center design for an organization. During the key stakeholder and SME interviews. a set of goals, requirements, assumptions and constraints were identified. Evaluate each of the requirements, assumptions, and constraints (RAC) and determine which design characteristics apply.
Match each of the Requirements, Assumptions and Constraints by dragging the RAC buttons (R1-R5) over the text of the appropriate Design Characteristic.
NOTE: RACs may fit one or more of the Design Characteristics.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 17
According to VMware-recommended best practices, on which cluster should each of the services be placed?
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
ManagementDNS ServersVCSAAD DomainNTP ServersResourceMS ExchangeMS SQLApache Web

NEW QUESTION 18
A solution architect has been tasked with designing a new environment for a company's growing needs, and has obtained this information:
• Uptime is critical during regular business hours when 95% of the transactions occur. Application uptime must be 99.9% during those hours.
• In a true Disaster, the business can withstand a day of data loss and half a day of downtime.
• The company is one year into a 5-year contact with the co-lo data center.
• The building that is currently occupied no hanger has any floor space available, but the company has 3 empty racks of space. The co-lo can provide up to 11KVA of power per rack.
• There are current contacts with Dell to provide servers and with Cisco to provide the network components.
• The network team has standardized on an end-to-end 10Gb network.
Based on this information, what are two requirements for the new design? (Choose two.)

  • A. RTO of 24 hours.
  • B. RTO of 12 hours.
  • C. The application must be available 99.9% during business hours.
  • D. 11KVA of power is available per rack.

Answer: BC

NEW QUESTION 19
In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Platform services controller

NEW QUESTION 20
A company is implementing a new ESXi host cluster at its New York data center.
• The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.
• Six ESXi hosts have been approved for this workload.
• The ESXi hosts are to be purchased from Dell with these specifications:
• 2x10 core 2.2GHz Intel CPU
• 128 GB of memory
• The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.
• All virtual machines should be protected by vSphere High Availability Which are two true statements regarding failover capacity? (Choose two.)

  • A. vSphete HA can be configured to reserve 25% of memory capacity for failover.
  • B. vSphete HA can be configured to specify two dedicated failover hosts.
  • C. vSphere HA can be configured to reserve 35% of memory capacity for failover.
  • D. vSphere HA can be configured to specify one dedicated failover host.

Answer: BC

NEW QUESTION 21
A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:
• two data centers for high availability
• synchronous replication to meet the zero minute RPO
• separating management workloads from application workloads
• dedicated 10Gb uplink for each low latency server
• single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)

  • A. Configure 1 Port Group with a dedicated 10Gb Uplink for low latency servers.
  • B. Deploy two clusters, one for management workloads and one for application workloads.
  • C. Build 2 Port Groups, one for management serves and one for application servers.
  • D. Install two vCenter Servers in Enhanced Link Mode.

Answer: AB

NEW QUESTION 22
......

Thanks for reading the newest 3v0-624 exam dumps! We recommend you to try the PREMIUM Passcertsure 3v0-624 dumps in VCE and PDF here: https://www.passcertsure.com/3v0-624-test/ (123 Q&As Dumps)