Q1. HOTSPOT - (Topic 12)
You are a SharePoint architect for Contoso, Ltd. The environment has the following servers:
You must support a streamlined topology.
You need to design the distribution of services and other components in the farm. Use the drop-down menus to select the answer choice that answers each question.
Answer:
Q2. HOTSPOT - (Topic 6)
You are planning the capacity of a SharePoint Server 2013 server farm.
In the table below, identify which requirements can be implemented in SharePoint Server 2013. Make only one selection in each row.
Answer:
Q3. - (Topic 6)
You are managing a SharePoint farm. The SharePoint databases are configured to run on a dedicated instance of Microsoft SQL Server 2008 R2 Service Pack 1.
You need to optimize query executions. What should you do?
A. Set the maximum degree of parallelism for SQL Server instances to 0.
B. Move the master database to a RAID 10 volume.
C. Set the maximum degree of parallelism for SQL Server instances to 1.
D. Set the maximum degree of parallelism for SQL Server instances to 32.
Answer: C
Explanation:
Set max degree of parallelism (MAXDOP) to 1 for instances of SQL Server that host SharePoint databases to make sure that a single SQL Server process serves each request. Important:
Setting the max degree of parallelism to any other number can cause a less optimal query plan to be used that will decrease SharePoint Server 2013 performance.
Ref: http://technet.microsoft.com/en-us/library/hh292622(v=office.15).aspx
Q4. - (Topic 6)
You are managing a site collection in a SharePoint farm.
You need to configure the minimum level of permissions necessary for users to manage lists in the site collection.
What permission level should you configure?
A. Edit
B. Contribute
C. Read
D. Limited Access
Answer: A
Q5. HOTSPOT - (Topic 9)
You need to back up the HR site collection.
What should you do? (To answer, select the appropriate option from each drop-down list in the answer area.)
Answer:
Q6. HOTSPOT - (Topic 12)
You plan to deploy a SharePoint Server 2013 server farm.
The president of your company sends you the following email message regarding the planned deployment: 'Our company loses an average of $5,000 per minute during service outages. At that rate, $300,000 per hour is a major cost to the company and should be reduced or eliminated. The company must provide continuity for IT services.''
The director of IT services sends you the following email message regarding the planned deployment: The company plans to implement the following as part of the deployment:
✑ Load balance all of the Web servers.
✑ Perform daily and hourly backups of all data.
✑ Centralize all of the service applications on a single server.
✑ Provide redundancy for all of the network components, such as switches and routers."
The director of IT services identifies the following requirements for the planned deployment:
✑ Four front-end Web servers
✑ One database server that will host all of the farm databases and will be replicated to another database server by using log shipping
✑ One dedicated application server that will host all of the service applications, including the Search Service Application and all of the search components.
Select Yes if the statement can be shown to be true based on the available information; otherwise select No.
Answer:
Q7. - (Topic 6)
You deploy a SharePoint Server 2013 server farm. You receive a custom display template.
You need to ensure that the custom display template is available in a site collection. What should you use to upload the template?
A. Design Manager
B. composed looks
C. result types
D. the Style Library
Answer: B
Explanation:
You can view existing display templates in Design Manager, but you don't create them in Design Manager the way that you create master pages and page layouts. Instead, you:
* Open your mapped network drive to the Master Page Gallery.
* Open one of the four folders in the Display Templates folder.
* Copy the HTML file for an existing display template that's similar to what you want. The exact location that you copy the file to does not matter, as long as it is in the Master Page Gallery.
* Open and modify your copy in an HTML editor.
Q8. HOTSPOT - (Topic 6)
You have a SharePoint Server 2013 server farm. You need to implement a site mailbox for a site.
Which link should you use from Site Contents? (To answer, select the appropriate link in the answer area.)
Answer:
Q9. - (Topic 6)
You plan to deploy a SharePoint Server 2013 server farm to a test environment on a single server. The server has the following configurations:
✑ A 64-bit processor that has four cores
✑ Windows Server 2008 Enterprise
✑ 8 GB of physical memory
✑ A 2-TB hard disk
You need to ensure that you can deploy the SharePoint Server 2013 farm to the server.
What should you do?
A. Upgrade the operating system.
B. Replace the processor.
C. Add more physical memory.
D. Add another hard disk drive.
Answer: A
Explanation: Need The 64-bit edition of Windows Server 2008 R2 Service Pack 1 (SP1) Standard, Enterprise, or Datacenter or the 64-bit edition of Windows Server 2012 Standard or Datacenter
Q10. - (Topic 6)
You are managing a SharePoint farm in an Active Directory Domain Services (AD DS) domain.
You need to configure a service account to use domain credentials. What should you do first?
A. Configure the service account to use a domain user account.
B. Register the domain credentials in the Farm Administrators group.
C. Configure the service account to use a local user account.
D. Register the domain credentials as a SharePoint managed account.
Answer: D