Q1. You are using Microsoft Test Manager (MTM).
You plan to reduce the maintenance of test suites.
You need to create test suites for which the test cases are automatically added.
What are two possible types of test suites that achieve this goal? (Each correct answer presents a complete solution. Choose two.)
A. Exploratory-based
B. Static
C. Query-based
D. Requirements-based
Answer: CD
Q2. You plan to roll out Microsoft Test Manager (MTM). Phase 1 testing will include manual testing only. In Phase 2, you will introduce automated test suites to complement manual testing.
You plan to use diagnostic data adapters for each phase.
You need to provide the correct diagnostic data adapters.
Which data diagnostic adapter is only applicable to manual testing and would accomplish this goal?
A. Code coverage
B. Actions
C. Video Recording
D. Event Log
E. Test impact
Answer: B
Q3. You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.
You need to generate a list of product backlog items (PBI) in MTM that have zero test cases.
What should you do?
A. Open each PBI and visually inspect the work item links.
B. Create a requirements-based test suite.
C. Click Requirements coverage in the Results view.
D. Create a Direct Links query.
Answer: D
Q4. You are using Microsoft Test Manager (MTM).
You need to assign test cases to testers so they will be able to find the tests they need to run.
What should you do?
A. Click Assign to designate the tester for each test case, then click Filter when you run the test.
B. In the Assigned to field for each test case, select the tester, then click Filter when you run the test.
C. For each test case, select the tester in the Assigned to field and use a work item query to filter on assigned test cases.
D. Create a test plan for each tester.
Answer: A
Q5. DRAG DROP
You are using Microsoft Test Manager (MTM) to manage your testing efforts. You need to produce a list of manual test runs over the past week.
What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Q6. You use Microsoft Test Manager (MTM) to conduct a manual test for an ASP.NET web application. You have created a test plan named Release 2.0.
The test plan needs to meet the following requirements:
You need to configure the Release 2.0 test plan by creating new test settings for the requirements and assigning the test settings to the test plan.
How should you configure the new test settings?
A. On the Data and Diagnostics page, select the Event Log and System Information options.
B. On the Data and Diagnostics page, select the Event Log, ASP.NET Client Proxy for IntelliTrace and Test Impact, and IntelliTrace options.
C. On the Data and Diagnostics page, select the Event Log and IntelliTrace options.
D. On the Data and Diagnostics page, select the Event Log and ASP.NET Client Proxy for IntelliTrace and Test Impact options.
Answer: B
Q7. You are using Microsoft Test Manager (MTM). You have created some shared steps for a recurring test sequence.
You plan to use these shared steps with fast-forward playback in multiple test cases.
You need to create an action recording for the shared steps.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)
A. Include the shared steps work item in the test case. Start running the test case with action recordings enabled. When the shared steps are reached, select Start and record.
B. Include the shared steps work item in the test case. Right-click the shared steps and click Create action recording.
C. Open the shared steps work item in Shared Steps Manager and select the tab for Create action recording.
D. From the Shared Steps Manager, select the shared steps work item and click Create action recording.
Answer: AD
Q8. You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template.
You want to organize your test cases by relating them to the user stories for the application under test.
You need to use a test suite that creates the Tests link type as you add test cases.
Which type of test suite should you create?
A. Static
B. Query-based
C. Linked
D. Requirements-based
Answer: D
Q9. You are using Microsoft Test Manager (MTM) to manually test for an ASP.NET website.
You have previously created a test plan named QA Release 1.0 that contains 115 test cases, and you are now planning the testing for Release 2.0.
The QA Release 2.0 test plan must meet the following requirements:
You need to facilitate simultaneous testing of the website by creating the QA Release 2.0 test plan according to the stated requirements.
What should you do?
A. Copy the root test suite from the QA Release 1.0 test plan into the QA Release 2.0 test plan.
B. Clone the root test suite from the QA Release 1.0 test plan into the QA Release 2.0 test plan.
C. Copy all the test cases from the QA Release 1.0 test plan into the QA Release 2.0 test plan by using the Create copy option in Test Case Manager.
D. Export all the test cases from the QA Release 1.0 test plan into Excel, then import them into the QA Release 2.0 test plan.
Answer: B
Q10. You are using Microsoft Test Manager (MTM).
A test case is already in production.
You need to modify the test case to indicate it is being reworked.
What should you do?
A. Change the test case state to Design.
B. Change the test case to Blocked.
C. Change the test case state to Closed.
D. Change the test plan state to Inactive.
Answer: A