Q1. - (Topic 14)
Your network contains a domain named contoso.com. The domain contains five virtualization servers. The servers are configured as shown in the following table.
The network also contains a server named Server6 that runs VMware vCenter Server.
In the domain, you install System Center 2012 Virtual Machine Manager (VMM) on a server named Server7. You configure Server7 to manage Server7.
You need to ensure that you can add all of the servers to the VMM fabric.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Upgrade Server1 to Hyper-V Server 2008 R2 Service Pack 1 (SP1).
B. Upgrade Server2 to Hyper-V Server 2008 R2 Service Pack 1 (SP1).
C. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server3.
D. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server4.
E. Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Server5.
Answer: C,D
Q2. - (Topic 9)
You need to recommend a solution to configure the SQL Server connection strings of WA1. The solution must meet the requirements for managing services in the private cloud.
What should you recommend? (More than one answer choice may achieve the goal. Select the BEST answer.)
A. Create multiple application profiles.
B. Create multiple App1 service templates.
C. Configure the Custom Properties of the App1 service template.
D. Configure the Service Settings of the App1 service template.
Answer: D
Q3. - (Topic 10)
You need to configure VMM 2012 to meet the private cloud services requirements for the human resources department users.
What should you configure? (Each correct answer presents part of the solution. Choose all that apply.)
A. A cloud
B. A capability profile
C. A user role
D. A virtual machine template
E. A service template
Answer: A,B,C,D
Explanation: As of VMM in System Center 2012, self-service users deploy their virtual machines and services to private clouds. This is a change from earlier versions of VMM, in which self-service user roles are assigned host groups, and virtual machines are deployed automatically (and transparently) to the most suitable host in the host group. A private cloud consists of one or more host groups that provide computing capacity and disk resources to self-service user roles. A private cloud can be assigned to multiple self-service user roles.
Ref: http://technet.microsoft.com/en-us/library/gg610573.aspx
Q4. HOTSPOT - (Topic 4)
You need to recommend a solution to meet the availability requirement for the support technicians. The solution must minimize administrative effort.
Which tasks should you recommend performing in Orchestrator, Service Manager and Operations Manager? (To answer, select the appropriate task for each product in the answer area.)
Answer:
Q5. - (Topic 6)
You need to implement a notification solution to meet the technical requirements.
What should you create from Operations Manager? (More than one answer choice may achieve the goal. Select the BEST answer.)
A. Two channels and one subscriber
B. One channel and one Subscriber
C. One channel and two subscribers
D. Two channels and two subscribers
Answer: B
Q6. - (Topic 2)
You need to recommend a solution to prepare the infrastructure for the planned monitoring implementation.
Which three actions should you recommend performing after NWT-SCOM01 is deployed and NWT-VMM01 is upgraded? Each correct answer presents part of the solution.
A. On NWT-VMM01, configure integration with Operations Manager.
B. On NWT-SCOM01, import all of the management
packs that start with Microsoft.SystemCenter.VirtualMachineManager.Storage.
C. On NWT-VMM01, configure integration with WSUS.
D. On NWT-SCOM01, install the Microsoft Monitoring Agent and the Virtual Machine Manager console.
E. On NWT-VMM01, install the Microsoft Monitoring Agent and the Operations Manager console.
Answer: A,B,E
Topic 3, Fabrikam, Inc (A)
Overview
Fabrikam, Inc. is a resale company that has 3,000 employees.
The company has a main office and a branch office. The main office is located in London.
The branch office is located in Montreal. The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Existing Environment
Active Directory
The network contains an Active Directory forest named fabrikam.com. The forest contains a single domain. All servers run Windows Server 2012 R2.
The main office contains two domain controllers named LON-DC1 and LON-DC2. The branch office contains two domain controllers named MON-DC1 and MON-DC2. Each office is configured as an Active Directory site. The site in London uses an IP address space of 192.168.0.0/17. The site in Montreal uses an IP address space of 192168.128.0/17.
System Center 2012 R2 Infrastructure
Fabrikam has a System Center 2012 R2 infrastructure. The infrastructure is configured as shown in the following table.
LON-OM1, LON-OM2, and MON-GW1 are in the same management group. LON-OM1 and LON-OM2 have Windows Identity Foundation (WIF) installed.
LON-VMM1 is configured for distributed key management.
The Microsoft Monitoring Agent is installed on 20 servers in the London office and 15 servers in the Montreal office. The servers in the London office are configured to use LON-OM1 as a management server. The servers in the Montreal office are configured to use MON-GW1 as a management server.
Operations Manager is used for server and application monitoring.
Windows Server Update Services (WSUS) is installed on a server named LON-WSUS1.
Applications
You have an application named App1 that is an order tracing application. App1 is written in unmanaged code.
Customers purchase products on the Fabrikam web site by using a web application named App2. App2 requires that users be authenticated. The check-out process for purchases has multiple steps.
You have an application named App3 that is a three-tier accounting application. App3 currently runs on physical servers.
Incident Management
Users enter incidents in Service Manager. When an incident is created, an incident event workflow is triggered to gather network information.
Requirements
Planned Changes
Fabrikam plans to implement the following changes:
Deploy App3 as a VMM service named Service3
Monitor network devices by using Operations Manager.
Create Operations Manager reports by using Report Builder.
Replace App1 with a new Microsoft .NET Framework application.
Provide users with the ability to select an impact value of All computers for an incident
Modify the incident event workflow to be triggered when an incident is modified or created.
Technical Requirements
Fabrikam must meet the following technical requirements:
In the London office, discover only network devices that contain Vendor1 or Vendor2 in their description.
Monitor the availability of App2 from locations in Europe, North America, and Asia.
Use VMM to manage updates to the virtualization infrastructure.
Be able to view App1 performance monitoring event details.
Implement Operations Manager reporting.
Be able to view Service3 availability.
Back up the VMM encryption key.
23. - (Topic 3)
You need to recommend a tool to view the performance monitoring results of App1.
What should you recommend?
A. The Performance Monitor Wizard
B. The Operations Manager web console
C. PerfView
D. Visual Studio Authoring Extensions
Q7. DRAG DROP - (Topic 9)
You need to recommend a storage fabric configuration for VMM. The solution must meet the requirements for the planned private cloud infrastructure.
Which three actions should you recommend performing in sequence? (To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Q8. - (Topic 9)
You need to recommend a solution to control the provisioning of the virtual machines by the research department users. The solution must meet the requirements for managing services in the private cloud.
What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.)
A. VMM placement rules and Service Manager service offerings
B. VMM custom properties and Orchestrator runbooks
C. VMM placement rules and capability profiles
D. A separate VMM cloud for the research department users
Answer: C
Explanation:
The Research department contains clustered Hyper-V hosts and standalone Hyper-V hosts. When research users deploy an instance of App1, the VMs in App1 must be highly available. Therefore, they must be deployed to the clustered Hyper-V hosts. A capability profile can specify that a VM must be highly available and a placement rule can ensure it is deployed to clustered Hyper-V hosts. A private cloud including the standalone Hyper-V hosts would not ensure this.
Q9. - (Topic 10)
You need to recommend changes to Server9 before you upgrade to VMM 2012.
What should you include in the recommendation?
A. Upgrade Server9 to Windows Server 2012.
B. Install the Windows Assessment and Deployment Kit (Windows ADK).
C. Install Microsoft .NET Framework 4.
D. Install SQL Server 2008 R2 Service Pack 1 (SP1) Standard on Server9.
Answer: D
Q10. - (Topic 11)
You need to recommend a design for the Operations Manager 2012 infrastructure.
What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.)
A.
. In the Dublin data center, one local management group that contains two management servers
. In each of the data centers in Dublin, Bangalore, Dallas, and Sydney, one remote management group that contains two management servers
B.
. One management group that contains all of the management servers
. One resource pool that contains all of the management servers
C.
. In the Dublin data center, one connected management group that contains two management servers
. In each of the data centers in Bangalore, Dallas, and Sydney, one local management group that contains two management servers
D.
. In the Dublin data center, one local management group that contains two management servers
. In each of the data centers in Bangalore, Dallas, and Sydney, one connected management group that contains two management servers
Answer: D
Topic 12, Fabrikam, Inc (B)
Overview
Fabrikam, Inc. is an IT services and hosting provider.
Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to the Internet.
Existing Environment
The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All of the servers in the forest run Windows Server 2012 R2.
The network contains a System Center 2012 R2 infrastructure that includes the following components:
Windows Azure Pack for Windows Server
Virtual Machine Manager (VMM)
Service Provider Foundation
Operations Manager
Orchestrator
Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment.
All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage. None of the VMM library servers are managed as VMM Hyper-V hosts.
Each Hyper-V host has four 10-GbE network adapters.
Requirements
Business Goals
Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is based in New York and Customer2 is based in Montreal. IT services will include assistance managing the services in the following table.
The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following components:
Operations Manager
App Controller
VMM
Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET applications, and Microsoft SQL Server. Customer1 plans to deploy nonclustered virtual machines only.
Planned Changes
Fabrikam plans to implement the following changes to the network:
Deploy a Remote Desktop Gateway (RD Gateway) virtual machine.
Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 R2.
General Requirements
Fabrikam identifies the following requirements for the planned deployment:
Hyper-V hosts must remain available if a single network adapter fails. You must be able to control the amount of bandwidth allocated to iSCSI traffic and Failover Clustering redirected traffic.
Virtual machines that run in the Fabrikam data centers must remain available if a single data center fails. The recovery point objective (RPO) must be 30 seconds.
The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-V hosts directly from the Virtual Machine Manager console.
Hyper-V management and storage traffic must be separated from the network traffic generated by virtual machine guests.
Virtual machines must be deployed by using a SAN copy.
If a site fails, a failover must be invoked manually.
Customer1 Requirements
Fabrikam identifies the following requirements for Customer1:
Customer1 will use Hyper-V Network Virtualization in its hosted environment.
Customer1 will require the ability to manage all of its cloud services from a single interface.
Each deployment of a virtual machine for Customer1 must trigger the execution of a runbook by using the Orchestrator web service. The runbook must execute before any user account logs on to the virtual machine.
Customer2 Requirements
Fabrikam identifies the following requirements for Customer2:
Customer2 must be able to connect to the console of the hosted virtual machines.
All of the metadata for any of the virtual machines of Customer1 must not be stored in Windows Azure.
123. DRAG DROP - (Topic 12)
You obtain a Client Authentication certificate.
You need to recommend a solution that meets the manageability requirements of Customer2.
From where should you recommend performing the required tasks? To answer, drag the appropriate locations to the correct tasks. Each location may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.