Actualtests 75940X Questions are updated and all 75940X answers are verified by experts. Once you have completely prepared with our 75940X exam prep kits you will be ready for the real 75940X exam without a problem. We have Avant-garde Avaya 75940X dumps study guide. PASSED 75940X First attempt! Here What I Did.

Online Avaya 75940X free dumps demo Below:

NEW QUESTION 1
Which three are found in the E:\ ACP_SW_4.0 folder of the Management Server Console (MSC)? (Choose three.)

  • A. Firmware for Extreme Networks VSP Switches
  • B. Software and Patches for Avaya Orchestrator and Avaya Aura® applications
  • C. Installation files for the vCenter client application
  • D. Software and Patches for VMware ESXi and vCenter
  • E. A copy of the Lifecycle workbook

Answer: ABD

NEW QUESTION 2
When planning to add additional VMs to an ACP 4200, to determine if an additional host server would be required, which tool can be used?

  • A. The Server resource calculator from the VMware vCenter client.
  • B. The Server Calc worksheet in the Lifecycle workbook.
  • C. The Server resource calculator tool in the Lifecycle workbook.
  • D. The Server calculator tool from Avaya Orchestrator.

Answer: D

NEW QUESTION 3
Aside from the difference in the depth of the enclosure, what other difference is there between the 48 Inch Model and 42 Inch Model of the ACP 4200 Avaya-branded Enclosure?

  • A. There is no other difference between the 48 Inch Model and 42 Inch Model.
  • B. The 48 Inch Model has a higher maximum wattage capacity compared to the 42 Inch Model.
  • C. The 48 Inch Model has a higher maximum weight compared to the 42 Inch Model.
  • D. The 48 Inch Model is only available in Grey while the 42 Inch Model is only available in Black.

Answer: B

Explanation:
Reference https://downloads.avaya.com/css/P8/documents/101054952 (15)

NEW QUESTION 4
An engineering implementation team has been asked to install an ACP 4200.
Which task related to the Avaya Orchestrator is completed during the installation by the implementation team?

  • A. Deploy the Rack and Device Dashboards.
  • B. Install Avaya Orchestrator.
  • C. Run the ACP Configuration Wizard.
  • D. Power on the Avaya Orchestrator virtual machine.

Answer: B

NEW QUESTION 5
What is the purpose of the VMware Distributed Resource Scheduler (DRS) as used in ACP 4200?

  • A. It enables a utility that balances computing workloads with available resources in a virtualized environment.
  • B. It enables an operational virtual machine to migrate from one ESXi host to another, which includes its running state and storage.
  • C. It provides monitoring of operating system and hardware failures, and also restarts virtual machines on other hosts within the resource pool.
  • D. It creates a pool of virtual disk space that can be shared by multiple virtual machines.

Answer: A

NEW QUESTION 6
Which Extreme Networks switch model is used in a new ACP 4200 release 4.0?

  • A. VSP 4850
  • B. VSP 7254
  • C. VSP 8400
  • D. VSP 7024

Answer: B

NEW QUESTION 7
Why does enabling VMware Enhanced vMotion Compatibility (EVC) prevent vMotion migrations from falling?

  • A. Because of incompatible DRS rules across the cluster
  • B. Because of incompatible HA rules across the cluster
  • C. Because of insufficient memory across the cluster
  • D. Because of incompatible CPUs across the cluster

Answer: D

NEW QUESTION 8
Refer to the exhibit.
75940X dumps exhibit
An administrator is adding new equipment to the ACP 4200 in the Avaya Orchestrator Configuration Wizard. How do the Device Description and Serial Number fields get populated in the Avaya Orchestrator
Configuration Wizard?

  • A. These are optional fields that do not need to be populated.
  • B. These are automatically detected by clicking on the Detect Hardware button.
  • C. These are manually entered by the administrator.
  • D. These are imported from the ACP Configurator Tool Excel spreadsheet.

Answer: C

NEW QUESTION 9
Refer to the exhibit.
75940X dumps exhibit
An administrator navigates to the Avaya Orchestrator page shown in the exhibit. The 4850GTS switches and the PIPS Pro1 PDUs are displaying an Orange status icon.
What does this indicate?

  • A. These devices have not been configured with correct credentials.
  • B. These devices have power supply issues.
  • C. These devices have services with status of warning.
  • D. These devices have reachability issues.

Answer: C

NEW QUESTION 10
Which two statements about the HP Nimble storage systems used in ACP 4200 are true? (Choose two.)

  • A. ACP 4200 may use the HP Nimble 33 Base unit with up to 2 Expansion units.
  • B. ACP 4200 may use the HP Nimble 16 Base unit with up to 5 Expansion units.
  • C. ACP 4200 may use the HP Nimble 16 Base unit with up to 2 Expansion units.
  • D. ACP 4200 may use the HP Nimble 33 Base unit with up to 5 Expansion units.

Answer: AB

NEW QUESTION 11
When an administrator logs into Avaya Orchestrator and on the Home Dashboard, the administrator sees dashlets for Storage, Network, Power and Rack View.
What does this indicate?

  • A. The Home Dashboard is behaving normally.
  • B. The Servers have Warning or Error messages.
  • C. The Storage, Network, Power and Rack systems have Warning or Error messages.
  • D. The Servers have not been added to Avaya Orchestrator's ACP 4200 Configuration Wizard.

Answer: A

NEW QUESTION 12
Refer to the exhibit.
75940X dumps exhibit
The CPU performance of Communication Manager (CM) shows a significant difference depending on the call rates.
Which statement about making configuration changes is true?

  • A. Increasing the number of Virtual CPUs allocated to CM might help to reduce this difference.
  • B. Ensuring that a secondary CM is available to allow for load-balancing might help to reduce this difference.
  • C. Migrating the CM Virtual Machine to another ESXi host that is less busy might help to reduce this difference.
  • D. Reducing this difference is not necessary because this is expected behavior.

Answer: B

NEW QUESTION 13
Using VMware networking in ACP 4200, how are Virtual NICs mapped to physical NICs?

  • A. Via DRS rules
  • B. On a 1-to-1 basis
  • C. Via Virtual Switches and Port Groups
  • D. Via the VNIIC mapping tables

Answer: D

NEW QUESTION 14
Which three tasks must be completed in preparation of a site for an ACP 4200 installation? (Choose three.)

  • A. Determine the list of Customer Administrators who will require login access to the ACP 4200.
  • B. Install power connections for the ACP 4200.
  • C. Plan the path from the delivery location to the permanent site.
  • D. Determine a permanent location for the ACP 4200.
  • E. Enable SNMP management on the network devices that will be connected to the ACP 4200.

Answer: ABC

NEW QUESTION 15
When used for an ACP 4200, which two features of the 48 inch Avaya branded enclosures are different from the 42 inch models? (Choose two.)

  • A. More space for PDUs (up to 15000 Watts)
  • B. More space for additional servers
  • C. Higher operating temperature (up to 45 degrees Celsius)
  • D. More space for fans and better cooling capacity (51,200 BTU)
  • E. Use of vertical PDUs instead of horizontal

Answer: AC

NEW QUESTION 16
How can the administrator check the status of all services being monitored by Avaya Orchestrator?

  • A. It is not possibl
  • B. Services are displayed on a per-Host basis only.
  • C. By navigating to Quick View-All Service Problems.
  • D. By navigating to Details-Service Status.
  • E. By navigating to ACP 4200 Configuration Wizard-Service.

Answer: B

NEW QUESTION 17
An administrator needs to access Avaya Orchestrator.
How does an administrator log into the management interface of Avaya Orchestrator?

  • A. By using a browser to login to System Manager, then clicking on the Avaya Orchestrator link.
  • B. By using a browser to login to Avaya Orchestrator's FQDN or IP address.
  • C. By downloading and using the System Manager Administrator client.
  • D. By downloading and using the Avaya Orchestrator Administrator client.

Answer: B

NEW QUESTION 18
An installation engineer is installing the power connections to the ACP 4200. What must the installation engineer be aware of?

  • A. Before connecting the power, the power switches of all components in the rack must be in the OFF position.
  • B. Power cables must only access the rack from the top of the rack.
  • C. Power connections must be within 10 feet (3 meters) of the rack.
  • D. Power cables must only access the rack from the bottom of the rack.

Answer: A