We provide real C2010-555 exam questions and answers braindumps in two formats. Download PDF & Practice Tests. Pass IBM C2010-555 Exam quickly & easily. The C2010-555 PDF type is available for reading and printing. You can print more and practice many times. With the help of our IBM C2010-555 dumps pdf and vce product and material, you can easily pass the C2010-555 exam.

Free C2010-555 Demo Online For IBM Certifitcation:

NEW QUESTION 1
Which delivered report option enables a user to dynamically interact with rendered report content including filtering of data, and changing of graphs, chart sizes and colors?

  • A. BIRT
  • B. Cognos
  • C. SQL Server
  • D. QBR Reporting

Answer: A

NEW QUESTION 2
A user tries to edit a meter in the Manage Meter Reading History dialog in the Assets application but finds that all the fields are read only.
Which of these meter types can be modified through this dialog?

  • A. DIAL
  • B. GAUGE
  • C. CONTINUOUS
  • D. CHARACTERISTIC

Answer: C

NEW QUESTION 3
A company has critical and time sensitive processes and tasks foe repairing assets. The company maintenance supervisor would like to be notified if any of the time sensitive tasks are overdue.
What application would the company use to configure this?

  • A. Workflow
  • B. Escalation
  • C. Cron Task
  • D. Interaction

Answer: C

NEW QUESTION 4
A vendor requires a payment of 20% of the purchase price when the purchase order (PO) is sent and the company wants to withhold of the payment until 90 days after receiving the item before final payment is made.
How would this be accomplished?

  • A. A Purchase Requisition would be created and three invoices would be generated via the invoicing applicatio
  • B. One invoice for 20%, one for 60% and one for 20%.
  • C. A Price Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt.
  • D. A Blanket Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt.
  • E. A Purchase Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt.

Answer: D

NEW QUESTION 5
An administrator needs to report failures that are occuring on a monthly basis. There is a requirement to use the Failure Class to report these failures.
Which applications can accomplish this?

  • A. Hazards, Precautions, Job Plans
  • B. Assets, Locations, Work Order Tracking
  • C. Job Plans, Routes, Work Order Tracking
  • D. Preventive Maintenance, Condition Monitoring, Safety Plans

Answer: B

NEW QUESTION 6
A company wishes to configure Maximo so that meter readings automatically create work orders based on condition monitoring points. The company has already configured the system in Organizational settings and created the appropriate condition monitoring points.
What additionally needs to be configured for this be accomplish?

  • A. Any meter should be added to the asset and the ConditionMonWoGenCronTask should be active e
  • B. A continuous type meter should be added to an asset and the PMWOGenCronTask should be active.
  • C. A gauge type meter should be added to an asset and the MeasurePointWoGenCronTask should be active.
  • D. A characteristic type meter should be added to an asset and the ConditionMonWoGenCronTask should be active.

Answer: B

NEW QUESTION 7
A user has entered a material receipt in error and wishes to correct it. Which action should be performed?

  • A. Void Receipt
  • B. Credit Invoice
  • C. Return Material
  • D. Cancel Receipt

Answer: A

NEW QUESTION 8
A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses.
Where can these values be configured?

  • A. System Properties
  • B. Work Type settings
  • C. WOSTATUS Domain
  • D. Change Work Order Options action

Answer: B

NEW QUESTION 9
At what level are service items defined?

  • A. Set
  • B. Site
  • C. System
  • D. Organization

Answer: A

NEW QUESTION 10
A company wishes to apply an item assembly structure to a location. Which field on the location record is required for this to take place?

  • A. Asset
  • B. Spare Parts
  • C. Rotating Item
  • D. Hierarchical System

Answer: C

NEW QUESTION 11
A company wants the escalation action and notification to be applied to an expired purchase contract. Which of the following must be defined?

  • A. Site
  • B. Organization
  • C. Escalation Point
  • D. Escalation Group

Answer: C

NEW QUESTION 12
What can be performed in the Assignments tab of Work Order Tracking?

  • A. Initiate an assignment into STARTED status.
  • B. Reassign from one person group to another.
  • C. Find an available crew for a type requirement.
  • D. Split an assignment to the labor code's next working shift.

Answer: C

NEW QUESTION 13
A company has a requirement to identify and characterize similar assets. In which application can this be done?

  • A. Sets
  • B. Actions
  • C. Domains
  • D. Classifications

Answer: D

NEW QUESTION 14
A company has a requirement to share calendar, classification, job plan, item description and PM data. What needs to be created?

  • A. Single organization, single site environment
  • B. Multiple organizations with a shared site environment
  • C. Multiple organizations with one site per organization environment
  • D. Multiple organizations with multiple sites per organization environment

Answer: A

NEW QUESTION 15
A company has a requirement to have items in the storerooms to be reordered automatically. How can this be achieved?

  • A. Reorder Escalation
  • B. Reorder Cron Task
  • C. Reorder – Reorder Items
  • D. Reorder Direct Issue Items/Services

Answer: C

NEW QUESTION 16
Maintenance is required on an asset at every 6,000 miles that uses job plan JP6K, and there is an additional Job Plan, JP18K, that is used at every 18,000 miles. This Meter-Based Frequency PM has a frequency of 6,000 miles.
What are the correct sequence values to use on the Job Plan Sequence tab?

  • A. JP6K = 1JP18K = 2
  • B. JP6K = 1JP18K = 3
  • C. JP6K = 0JP18K = 3
  • D. JP6K = 6JP18K = 18

Answer: B

NEW QUESTION 17
A company has an asset that has failed and an administrator needs to create a work plan that includes exact steps and descriptions that need to be followed to get the asset in operating status. Which option does the administrator need to follow?

  • A. Create follow up work orders
  • B. Create Job Plan from Work Plan
  • C. Create a work order and add actuals
  • D. Create a work order, add tasks and populate the summary field

Answer: D

NEW QUESTION 18
......