CPIM-BSP Exam - CPIM - Basics of Supply Chain Management

certleader.com

Master the CPIM-BSP CPIM - Basics of Supply Chain Management content and be ready for exam day success quickly with this Testking CPIM-BSP exam cram. We guarantee it!We make it a reality and give you real CPIM-BSP questions in our APICS CPIM-BSP braindumps.Latest 100% VALID APICS CPIM-BSP Exam Questions Dumps at below page. You can use our APICS CPIM-BSP braindumps and pass your exam.

APICS CPIM-BSP Free Dumps Questions Online, Read and Test Now.

NEW QUESTION 1

Typically the highest cost for warehousing is the cost related to:

  • A. space.
  • B. labor.
  • C. equipment for materials handling.
  • D. the information system.

Answer: A

NEW QUESTION 2

Which of the following differences must be taken into consideration when dealing with a global distribution system?

  • A. Culture
  • B. Cost
  • C. Carriers
  • D. Computer systems

Answer: A

NEW QUESTION 3

Which of the following factors is included in cost of goods sold?

  • A. Revenue
  • B. General and administrative expenses
  • C. Overhead
  • D. Standard cost

Answer: C

NEW QUESTION 4

An electronic board that provides visibility on the production floor is:

  • A. andon.
  • B. anova.
  • C. ANSI.
  • D. alpha factor.

Answer: A

NEW QUESTION 5

Which of the following processes is concerned with the transfer or delivery of goods or services?

  • A. Distribution channel
  • B. Supply chain
  • C. Transaction channel
  • D. Value chain

Answer: A

NEW QUESTION 6

What is the output of sales and operations planning?

  • A. Production plan
  • B. Master production schedule
  • C. Sales plan
  • D. Production order

Answer: A

NEW QUESTION 7

Companies typically make final purchasing decisions based on which of the following supplier characteristics?

  • A. Reverse logistics
  • B. Personal relationships
  • C. Delivery reliability
  • D. Market share

Answer: C

NEW QUESTION 8

Effective inventory management should lead to which of the following?

  • A. Higher inventory turns
  • B. Higher product quality
  • C. Lower cost of capital
  • D. Elimination of inventory cycle counting

Answer: A

NEW QUESTION 9

Which of the following terms represents a complete supply chain dedicated to the flow of products and materials for the purpose of returns, repair, remanufacture, or recycling?

  • A. Responsible landfill
  • B. Remanufacturing resource planning
  • C. Reverse logistics
  • D. Global distribution

Answer: C

NEW QUESTION 10

A firm offers products configured from a large number of stocked options. Which of the following production environments is the firm most likely to use?

  • A. Engineer-to-order
  • B. Make-to-order
  • C. Assemble-to-order
  • D. Make-to-stock

Answer: C

NEW QUESTION 11

Which of the following production environment strategies requires unique design or significant customization?

  • A. Make-to-order
  • B. Assemble-to-order
  • C. Make-to-stock
  • D. Engineer-to-order

Answer: D

NEW QUESTION 12

Which of the following forecast inputs is considered to be intrinsic data?

  • A. Demographic
  • B. Econometric
  • C. Historical sales
  • D. Market survey

Answer: C

NEW QUESTION 13

Which of the following characteristics is most distinctive of lean manufacturing?

  • A. Teamwork
  • B. Continuous improvement
  • C. Qualitative measurements
  • D. Bottom-line results

Answer: B

NEW QUESTION 14

The primary purpose of enterprise resources planning is to:

  • A. focus on the manufacturing function within an organization.
  • B. integrate an approach to business management.
  • C. use external knowledge to seek an internal advantage.
  • D. provide data protection along the supply chain.

Answer: B

NEW QUESTION 15

Which of the following statements describes the difference between capacity requirements planning and material requirements planning ?

  • A. Material requirements planning ignores capacity constraints.
  • B. Capacity requirements planning accounts for material.
  • C. Material requirements planning is confined by capacity constraints.
  • D. Capacity requirements planning only accounts for critical resources.

Answer: A

NEW QUESTION 16

Which of the following forecasting techniques eliminates the need to keep months of historical data?

  • A. Exponential smoothing
  • B. Seasonal index
  • C. Delphi
  • D. Trend

Answer: A

NEW QUESTION 17

Which of the following describes a competitive characteristic that a firm must exhibit to be considered as a supplier in a market?

  • A. Marketing research
  • B. Manufacturing automation
  • C. Order qualifier
  • D. Order winner

Answer: C

NEW QUESTION 18

Earliest job due date is an example of:

  • A. dispatching.
  • B. infinite scheduling.
  • C. a chase strategy.
  • D. available-to-promise.

Answer: A

NEW QUESTION 19

The portion of a firm's inventory and planned production that is not already committed is referred to as:

  • A. planned order receipts.
  • B. projected inventory balance.
  • C. master production schedule due date.
  • D. available-to-promise.

Answer: D

NEW QUESTION 20

Which of the following factors is a primary consideration when contracting with a supplier?

  • A. Inventory levels
  • B. Order cost
  • C. Quantity discounts
  • D. Product quality

Answer: D

NEW QUESTION 21

Which of the following statements characterizes an intermittent manufacturing environment?

  • A. Work center load is predictable.
  • B. Routings for all products are the same.
  • C. Work centers are organized by function.
  • D. Kanban is the most appropriate scheduling method.

Answer: C

NEW QUESTION 22

Knowing average daily consumption and on hand inventory, a company can calculate:

  • A. storage cost.
  • B. days of supply.
  • C. annual usage rate.
  • D. annual cost of goods sold.

Answer: B

NEW QUESTION 23

Which of the following measures should a company focus on to reduce variation in the product?

  • A. Mode
  • B. Mean
  • C. Median
  • D. Standard deviation

Answer: D

NEW QUESTION 24

What is the order point when demand is 120 units per week, the lead time is 2 weeks, and safety stock is 60 units?

  • A. 180
  • B. 240
  • C. 300
  • D. 360

Answer: C

NEW QUESTION 25

Which of the following circumstances will cause a decrease in a work center's utilization?

  • A. Working overtime
  • B. Working below standard
  • C. Lack of materials
  • D. Rework operations

Answer: C

NEW QUESTION 26
......

Thanks for reading the newest CPIM-BSP exam dumps! We recommend you to try the PREMIUM Dumps-files.com CPIM-BSP dumps in VCE and PDF here: https://www.dumps-files.com/files/CPIM-BSP/ (155 Q&As Dumps)