NEW QUESTION 1
When interacting with team members, the Agile project manager should:

  • A. Ask team members to do things by phrasing the statement as a request rather than as a demand.
  • B. Ignore team member input and emotions when important decisions have to be made.
  • C. Proceed cautiously when requesting team members to do something likely to make them unhappy.
  • D. Disagree with the team based on the merit of the issue without considering how the team is feeling.

Answer: A

NEW QUESTION 2
An Agile team best ensures product quality through:

  • A. The development team’s use of pair programming.
  • B. Quality assurance’s daily collaboration with the development team.
  • C. More frequent inspection after each iteration.
  • D. Feedback gathered during iteration retrospectives.

Answer: C

NEW QUESTION 3
Which management style does Agile advocate?

  • A. Task
  • B. Team
  • C. Product
  • D. Performance

Answer: B

NEW QUESTION 4
Project managers use velocity to determine:

  • A. If the team is committing to an appropriate amount of work for the iteration.
  • B. How much work each team member is capable of completing during an iteration.
  • C. How much work teams that are similar in size are capable of completing during an iteration.
  • D. If the Product Owner is prioritizing work appropriately in preparation for iteration planning.

Answer: A

NEW QUESTION 5
User stories are temporary artifacts. They are considered relevant until the:

  • A. Team completes them.
  • B. End of the project.
  • C. Release is complete.
  • D. End of the sprint.

Answer: A

NEW QUESTION 6
What do project reports show during the Sprint review meeting?

  • A. Estimates compared to the baseline
  • B. Actual results to the plan
  • C. Return on investment (ROI)
  • D. Earned value measurement (EVM)

Answer: C

NEW QUESTION 7
How is the participatory design process characterized?

  • A. A well-planned and well-documented process is documented for each of the iterations in the project.
  • B. Users including project team members participate in the planning process for the project plan.
  • C. End users participate and assist in the design process from the beginning of the project.
  • D. A high level brainstorming process is conducted for the project team and the project sponsor.

Answer: C

NEW QUESTION 8
Spike solutions are appropriate when:

  • A. the business requirements are vague or inadequate for an iteration.
  • B. a technology is understood well and has been used for a while, but needs a problem to be debugged.
  • C. there is insufficient time to refactor, but there is a need to resolve a specific problem.
  • D. a specific technicalQUESTION NO:needs to be answered, stopping work on the spike as soon as it answers that question.

Answer: D

NEW QUESTION 9
Which of the seven principles of software development is best intended to solve the problem of inventories causing hidden errors in the process?

  • A. Fast-Flexible-Flow
  • B. Optimize the Whole
  • C. Deliver Early and Often
  • D. Eliminate Waste

Answer: D

NEW QUESTION 10
Which of the following techniques best encourages osmotic communication?

  • A. Reviewing requirements frequently with the Product Owner
  • B. Having the Product Owner attend daily standups
  • C. Inviting the customer to attend every iteration demo
  • D. Seating the team members together in a work area

Answer: D

NEW QUESTION 11
A “Scrum of Scrums” meeting is:

  • A. Another name for the daily standup project meeting in a Scrum team.
  • B. Amechanism that coordinates multiple teams working on a single project.
  • C. Aproject meeting that happens twice every day across the Scrum teams.
  • D. An occasional leadership meeting that provides direction to multiple Scrum teams.

Answer: B

NEW QUESTION 12
The team estimation game method mainly consists of a:

  • A. Pile of cards with user, capability, and value to be prioritized by the project team.
  • B. Spreadsheet with backlog issues to be prioritized and each to be given a prioritizationnumber.
  • C. White board session where iterations are estimated and related to the project road map.
  • D. Brainstorm session where resources are related to prioritized work packages.

Answer: A

NEW QUESTION 13
The velocity chart, storyboard, burndown chart, and impediment list are often communicated using:

  • A. Status reports.
  • B. Information radiators.
  • C. Portfolio presentations.
  • D. Project data packages.

Answer: B

NEW QUESTION 14
A full cycle of design-code-verifyrelease practiced by extreme Programming (XP) teams is called:

  • A. Story
  • B. Timebox
  • C. Iteration
  • D. Burndown

Answer: C

NEW QUESTION 15
In the Lean process, the focus is on:

  • A. Managing team efficiency.
  • B. Optimizing completed work across the process stream.
  • C. Using the optimal resources.
  • D. Cross training the team to eliminate bottlenecks.

Answer: B

NEW QUESTION 16
Which of the following is part of the 12 practices defined in eXtreme Programming (XP)?

  • A. Risk management
  • B. Small releases
  • C. Project management
  • D. Project charter

Answer: B

NEW QUESTION 17
The primary purpose of a Sprint Review is for the team to:

  • A. Demonstrate what was accomplished during the sprint.
  • B. Discuss what went well, whatdidn’t, and ways to improve.
  • C. Prioritize and estimate stories planned for the next sprint.
  • D. Individually provide status updates on user stories in progress.

Answer: A