Want to know Examcollection PMP Exam practice test features? Want to lear more about PMP Project Management Professional certification experience? Study Printable PMP PMP answers to Up to date PMP questions at Examcollection. Gat a success with an absolute guarantee to pass PMP PMP (Project Management Professional) test on your first attempt.

Free PMP Demo Online For PMP Certifitcation:

NEW QUESTION 1

Which of the following is a tool or technique used in the Determine Budget process?

  • A. Variance analysis
  • B. Three-point estimating
  • C. Bottom-up estimating
  • D. Historical relationships

Answer: D

NEW QUESTION 2

Which process group contains the processes performed to finalize all activities?

  • A. Planning Process Group
  • B. Executing Process Group
  • C. Monitoring and Controlling Process Group
  • D. Closing Process Group

Answer: D

NEW QUESTION 3

Which Process Group and Knowledge Area include the Sequence Activities process?

  • A. Executing Process Group and Project Time Management
  • B. Executing Process Group and Project Cost Management
  • C. Planning Process Group and Project Time Management
  • D. Planning Process Group and Project Cost Management

Answer: C

NEW QUESTION 4

The most appropriate project life cycle model for an environment with a high level of change and extensive stakeholder involvement in projects is:

  • A. adaptive
  • B. reflexive
  • C. predictive
  • D. iterative

Answer: A

NEW QUESTION 5

What does a CPI value greater than 1.0 indicate?

  • A. Cost right at the estimated value
  • B. Cost under the estimated value
  • C. Cost right at the actual value
  • D. Cost over the estimated value

Answer: B

NEW QUESTION 6

An input to Close Project or Phase is:

  • A. Accepted deliverables,
  • B. Final products or services,
  • C. Document updates,
  • D. Work performance information.

Answer: A

NEW QUESTION 7

Which of the following is a project constraint?

  • A. Twenty-five percent staff turnover is expected.
  • B. The technology to be used is cutting-edge.
  • C. Project leadership may change due to volatile political environment.
  • D. The product is needed in 250 days.

Answer: D

NEW QUESTION 8

Which of the following correctly lists the configuration management activities included in the
Integrated Change Control process?

  • A. Configuration definition, configuration status accounting, configuration monitoring and control
  • B. Configuration identification, configuration status accounting, configuration verification and audit
  • C. Configuration identification, configuration status reporting, configuration verification and audit
  • D. Configuration definition, configuration status reporting, configuration monitoring and Control

Answer: B

NEW QUESTION 9

In which process might you use risk reassessment as a tool and technique?

  • A. Qualitative risk analysis
  • B. Risk monitoring and control
  • C. Monitor and control project work
  • D. Risk response planning

Answer: B

NEW QUESTION 10

A project in which the scope, time, and cost of delivery are determined as early as possible is following a life cycle that is:

  • A. Adaptive
  • B. Predictive
  • C. Incremental
  • D. Iterative

Answer: B

NEW QUESTION 11

When a control chart is used to monitor performance of a process, which of the following will be set by the project manager and the appropriate stakeholders to reflect the point(s) at which corrective action will be taken to prevent exceeding the specification limits?

  • A. Upper and lower control limits
  • B. Upper and lower specification limits
  • C. Process mean
  • D. Data points

Answer: A

NEW QUESTION 12

Plan Communications Management develops an approach and plan for project communications based on stakeholders' needs and requirements and:

  • A. Available organizational assets
  • B. Project staff assignments
  • C. Interpersonal skills
  • D. Enterprise environmental factors

Answer: A

NEW QUESTION 13

The staffing management plan is part of the:

  • A. organizational process assets.
  • B. resource calendar.
  • C. human resource plan.
  • D. Develop Project Team process.

Answer: C

NEW QUESTION 14

What is the tool and technique used to request seller responses?

  • A. Procurement documents
  • B. Expert judgment
  • C. Bidder conferences
  • D. Contract types

Answer: C

NEW QUESTION 15

A risk may be graded into different priorities by which process?

  • A. Risk monitoring and controlling
  • B. Risk response planning
  • C. Qualitative risk analysis
  • D. Quantitative risk analysis

Answer: C

NEW QUESTION 16

An output of the Direct and Manage Project Work process is:

  • A. Deliverables.
  • B. Activity lists.
  • C. A work breakdown structure.
  • D. A scope statement.

Answer: A

NEW QUESTION 17

At which stage of the project should certain factors such as the unavailability of human resources due to constraint be considered?

  • A. Initiation
  • B. Execution
  • C. Planning
  • D. Monitoring and Controlling

Answer: C

NEW QUESTION 18

Which of the following is an example of contract administration?

  • A. Negotiating the contract
  • B. Authorizing contractor work
  • C. Developing the statement of work
  • D. Establishing evaluation criteria

Answer: B

NEW QUESTION 19

Which of the following is an input to Direct and Manage Project Execution?

  • A. Requested changes
  • B. Approved change requests
  • C. Work performance information
  • D. Implemented defect repair

Answer: A

NEW QUESTION 20

A tool or technique in Perform Quality Control that a project manager would use is:

  • A. quality audits.
  • B. process analysis.
  • C. benchmarking.
  • D. inspection.

Answer: D

NEW QUESTION 21

Which schedule network analysis technique modifies the project schedule to account for limited resources?

  • A. Human resource planning
  • B. Fast tracking
  • C. Critical chain method
  • D. Rolling wave planning

Answer: C

NEW QUESTION 22

Which piece of information is part of the WBS Dictionary?

  • A. Responsible organization
  • B. Change requests
  • C. Validated deliverables
  • D. Organizational process assets

Answer: A